top of page

Fight Destructive Development in West Arvada

Sign Up for Updates

Quick Links

A proposed development of Welby Gardens would create 12 Four Story Apartment buildings and 53 townhomes on an infill site that has for decades been treated with pesticides and fertilizers. We are fighting for a safer alternative that is more compatible and less impactful on the surrounding neighborhoods.

We meet every Saturday at 9am. Sign up for notifications about meeting locations. 

Notices

(Click Headline to View)
Contact Us

Sign our Petition to Oppose the Development As Proposed

The Proposed Development

Planned Development

Current Site

Pages from _Welby Gardens Community Meet

Similar Project by Developer

image_edited.jpg

The developer has planned 12 Four Story Apartment buildings and 53 townhomes on an infill lot with only one access point. The site is surrounding by single family residences and would be about 7 times as dense as the neighboring communities. 

NOW is the time to show our opposition and concern to the Arvada City Council and other involved authorities. 

Our Concerns

Health and Environmental

Explore the causes we champion and the impact we aspire to make in our communities.

The current site has been a greenhouse grow site for nearly fifty years and has likely been treated with a multitude of pesticides and fertilizers that may have contained many highly toxic and carcinogenic chemicals including Chlorodane, Nitrofen, Paraquat, Asbestos. All of which have now been either entirely banned or highly restricted in use due to toxicity. 

Traffic 

The development would house nearly 1000 residents in an area with no walkable amenities or public transit. The site is accessed by one single unlined stub road onto a busy section of 64th with currently no traffic light. There is also high concern for considerable spillover and through traffic in the surrounding neighborhoods 

Emergency Access and Egress

image.png

The development would have only one access and egress point for 450 residences. For reference, the neighborhood on the east has 72 homes, and two access points. The backup emergency egress for the development would be through the parking lot of the Senior Living Facility it abuts to. In the event of a major emergency, like a wildfire, nearly 1000 residents would be attempting to exit through one stub road, or through the parking lot while emergency responders would be attempting to reach and evacuate the residents of the Senior Living facility.

Overall Compatibility

The site is currently zoned Arvada MX-S. Which is a mixed-use suburban designation. The Arvada Comprehensive Plan states that these type of sites should "be strategically located, high intensity, pedestrian oriented activity centers" and should "be located in urban centers or designated corridors" and "demonstrate the following characteristics:"

 

 

 

 

 

 

 

All items the proposal falls short on.

 

The Plan also states that:

Even though the site is zoned as Mixed Used, the site and proposal drastically differ from what the Arvada Comprehensive Plan calls for​

-transit supportive residential densities

-transit supportive mix of retail and employment

-streets or other features that define the center

-public plazas, gathering centers, or amenities

-transit service

-pedestrian oriented

-interconnected network of multimodal streets

-building height transitions and building step-downs should be compatible with adjacent development

-use major arterials or collector streets and boundaries between developments

-maintain appropriate view corridors

-density will generally decrease in the western parts of the City

image.png

Arvada Examples of MX-S Expectations

image.png
bottom of page